Rubicon Models - M113A1 Armoured Personnel Carrier
Rubicon Models - M113A1 Armoured Personnel Carrier is backordered and will ship as soon as it is back in stock.
Click & Collect available at Gap Games @ Newsxpress - The Gap Village Shopping Centre
Usually ready in 2 business hours
Rubicon Models - M113A1 Armoured Personnel Carrier is backordered and will ship as soon as it is back in stock.
Description
Description
The M113 is a fully tracked armored personnel carrier (APC) that was developed and produced by the FMC Corporation. The M113 was sent to United States Army Europe in 1961 to replace the mechanized infantry’s M59 APCs. The M113 was first used in combat in April 1962 after the United States provided the South Vietnamese Army (ARVN) with heavy weaponry such as the M113, under the Military Assistance Command, Vietnam (MACV) program. Eventually, the M113 was the most widely used armored vehicle of the US Army in the Vietnam War and was used to break through heavy thickets in the midst of the jungle to attack and overrun enemy positions. It was largely known as an “APC” or an “ACAV” (armored cavalry assault vehicle) by the allied forces.
The M113 was the first aluminum hull combat vehicle to be put into mass production. Much lighter than earlier similar vehicles, its aluminum armor was designed to be thick enough to protect the crew and passengers against small arms fire, but light enough that the vehicle was air transportable and moderately amphibious.
In the US Army, the M113 series have long been replaced as front-line combat vehicles by the M2 and M3 Bradleys, but large numbers are still used in support roles such as armored ambulance, mortar carrier, engineer vehicle, and command vehicle. The US Army’s heavy brigade combat teams are equipped with approximately 6,000 M113s and 4,000 Bradleys.
The M113’s versatility spawned a wide variety of adaptations that live on worldwide and in US service. These variants together currently represent about half of US Army armored vehicles. To date, it is estimated that over 80,000 vehicles in the M113 family have been produced and used by over 50 countries worldwide; making it one of the most widely used armored fighting vehicles of all time. M113 production was terminated in 2007 to be replaced by a turretless variant of the Bradley Fighting Vehicle.
Product Highlights:
- Option to build a standard M113A1 or with ACAV upgrade
- Option to build as an M113A1 with Australian modifications
- Hatches can be in open or closed position
- Comes with engine and interior details
- Crew in US & RAAC uniform (driver & gunner) included
Plastic kit, supplied unassembled and unpainted.
Delivery & Shipping
Delivery & Shipping
Standard Postage*: items are usually sent within 1-3 business days* (M-F).
Express Postage*: items are usually sent same business day (M-F) if order received prior to 2pm.*
New Zealand: items are usually sent within 1-3 business days* (M-F).
*Note: Signature on delivery is not included in above costs however is available on request.
*All items are sent with "Authority to Leave" by default
*Postage/Preparation times can be affected by other events/situations eg (and not limited to)
- Covid, Severe Weather Events, delayed arrival of orders, volume of orders, staffing,
- Please wait 4 business days from date of in-stock order or release date of product before contacting us to enquire about your orders fulfillment.
COMBINED ORDERS:
Please note that Gap Games will no longer combine separate orders. Postage MUST be paid on all orders requiring postage.
Should you wish to add items to an existing unfulfilled order please contact us on support@gapgames.com.au and we will endeavour to add these items.
Please note that we can not add additional items to orders that have processed to picking/packing stage.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
